Echo is the sole owner of the 2 million tonne per annum Bronzewing Processing Hub, located in the southerly region of the Yandal Gold Project.

While this strategic and high value asset is currently on care-and-maintenance, studies undertaken by Echo demonstrate it can be refurbished in a 6 month timeframe and made operational when required for approximately A$12.5 million. Access to such a valuable and low cost asset provides a very low risk and timely access to cashflow for Echo.

In addition to the gold processing mill, all associated infrastructure for Echo to transition to gold production is available nearby including a 200 person mining camp, operational airstrip, power, water and telecommunication infrastructure and a network of haulage and access roads.

In addition to utilising the mill for its own production, Echo has the opportunity to toll-treat material from other regional operators.